Application shall be carried out at ambient air and substrate temperatures from +5°C to +35°C..
Apply a sufficient layer of the product onto the surface to be treated using a PVC brush or by spraying.
Leave to react for 30 to 120 minutes, depending on the grade of steel, thickness, and type of welding
After pickling, rinse the surface with a high-pressure water jet.