Preparation of the material for use
1. Mix with a special mixer attachment at 150-300 rpm.
2. Mix component A thoroughly for at least 3 minutes.
3. Pour component B into the container with component A and mix for 3 minutes, paying attention to
Pay special attention to mixing the material at the bottom and sides.
4. Pour the mixture into a clean container and stir for 1 minute.
Recommendations for application
1. Apply in 1-2 layers with a total consumption of 0.3-0.5 kg/m2 using a roller or a smooth trowel with
The interval between layers should be 8-24 hours.
Filling with quartz sand
1. Quartz sand is applied evenly over the entire area, without gaps or hills.
Preparation of the material for use
Paint application is carried out in well-ventilated work areas at a base temperature of (-10)0 C to +300 C.
The composition must be thoroughly mixed before use.
Recommendations for application
Apply to a clean, degreased surface by brush, roller, or spray gun in 1–2 coats. If the coating thickens, dilute with solvent at a rate of 15–20% to achieve the required viscosity. Painting at sub-zero temperatures may be carried out on a dry, ice-free surface.
icy surface. The paint film cures at a temperature of 20 °C for no more than 45 minutes.
Coating consumption: 0.05–0.25 kg/m². Clean the equipment with a solvent such as “Solvent” immediately after completion of work. Cured material can only be removed mechanically.