Preparation of the material for use
1. Mix with a special mixer attachment at 150-300 rpm.
2. Mix component A thoroughly for at least 3 minutes.
3. Pour component B into the container with component A and mix for 3 minutes, paying attention to
Pay special attention to mixing the material at the bottom and sides.
4. Pour the mixture into a clean container and stir for 1 minute.
Recommendations for application
1. Apply in 1-2 layers with a total consumption of 0.3-0.5 kg/m2 using a roller or a smooth trowel, with an interval of 8-24 hours between layers.
2. Putty solution: Spektron 1000-01 + Spektron Quartz (1:1).
Preparation of the material for use
1. Mix with a special mixer attachment at 150-300 rpm.
2. Mix component A thoroughly for at least 3 minutes.
3. Pour component B into the container with component A and mix for 3 minutes, paying attention to
Pay special attention to mixing the material at the bottom and sides.
4. Pour the mixture into a clean container and stir for 1 minute.
Recommendations for application
Applied in 1 layer with a consumption of 1.6-3.0 kg/m2 by pouring and spreading over the surface with a serrated tool.
use a spatula (rake). Use a needle roller to deaerate the material.